Energy Projects
ShowMe Ethanol, LLC
Show Me Ethanol, LLC
50 MGY Ethanol Plant
In August 2007 Midwest Mechanical was awarded the pipe rack installation contract for the 50 MGY Show Me Ethanol Plant.
As the engineer prepared and developed additional packages of work, Midwest was able to procure and perfomr the fabrication for teh balance of the entire plant and the piping installation for the Energy Center/Drying Area, Femenation, Cooling Tower, Loadout and Water Treatment areas of the plant. Much of the pipe was fabricated in our Kansas City fabrication shop and trucked the short distance to Carrollton for our on-stie crews to iinstall. Midwest Mechanical ultimately provide fabrication, installation and equipment setting for the 50 MGY ethanol plant over a nine month period.